Commercial roof repair
Seam failures, membrane punctures, ponding, flashing and curb leaks, and storm damage on EPDM, TPO and modified bitumen roofs. We locate the leak from the interior stain back to the source, repair the membrane and flashing, and document the repair for your building file. Emergency response for active leaks. City pages: Naperville, Downers Grove.
Commercial roof replacement and re-roofing
Full tear-off to the deck, or a recover over one existing layer where code and the deck allow — we tell you which in writing after a core cut and a moisture survey. New insulation to current energy code, tapered systems to fix ponding, and a manufacturer warranty on the membrane. Our guide to commercial re-roofing cost explains what drives the price.
Commercial roof installation
New construction and additions, from deck inspection through membrane, insulation, flashing and drains, on the builder’s schedule. See roof installation.
Commercial roof maintenance
Twice-yearly inspections (spring, after the hail season starts, and fall, before freeze-up), drain and scupper clearing, seam and flashing checks, and a photo report each visit. A maintained flat roof lasts 20 to 30 years; an unmaintained one fails at the drains in 10 to 15.
Commercial roof inspection
Condition assessments for purchases, lease turnovers, insurance and capital planning, with photos, a moisture survey where warranted, and a remaining-life estimate. Our guide to commercial roof inspection cost explains what an inspection includes.
Storm and hail damage
Hail bruises TPO and EPDM membranes and cracks modified bitumen surfacing; wind lifts flashing and displaces ballast. After a warned storm we inspect, photograph, write the scope your insurer needs and meet the adjuster. See the storm damage page.
Roof coatings
Silicone and acrylic coating systems that extend a sound but aging membrane roof by 10 to 15 years at a fraction of replacement cost — the right call when the deck and insulation are dry and the membrane is simply weathered. Not the right call over wet insulation, which is why the moisture survey comes first.